Sainsbury's
Petrol Filling Stations
Martindales have been working in the Petroleum industry for 30 years as Architects and Project Managers for major oil companies and petroleum retailers.

We are currently working on the entire PFS portfolio for Sainsbury's, the briefs of which include replacement of existing petroleum infrastructures, new build sites and re-imaging of existing sites.

As a member of the Institute of Petroleum and the APEA, we have expertise in delivering projects at all levels, from re-piping and tank installations, refurbishment and extension of existing sites through to new build Petrol Filling Stations, Convenience Stores, Roadside and Motorway Services Areas.

Daimler Chrysler
Head Office, Milton Keynes
This project is a £4.25m development which links the existing administration building with a logistics centre. This high profile development consists of three storeys of combined office and retail display area and also a new entrance and reception.

On the ground floor there is an extensive showroom space which is intended to showcase the wide range of the company’s products including articulated trucks. This part of the building has a feature treble-height curtain wall curved in a shallow S-shape.

The upper floors of the extension are set back from the curved façade such that meeting rooms and office space look down on the showroom.

Commercial

Waterlooville PFS Waterlooville PFS Blackpole PFS Grantham PFS Grantham PFS Longwater PFS Longwater PFS Portishead PFS Thanet PFS
Waterlooville - New build 6 pump PFS as part of a new Sainsbury's supermarket development.  This was a phased programme including a pre-fabricated kiosk building.  Delivered April 2015.

Blackpole - A knock down and rebuild of one of Sainsbury's oldest PFS sites to create new 4 pump site which has completely revived the site and created a layout which provides greater capacity with less congestion.  Delivered December 2014.

Longwater - Standalone refurbishment of an existing petrol station at Longwater in Norwich.  This included a remodelled forecourt to improve capacity on the site and new canopy structure giving it a fresh modern look.  Delivered November 2014.


Thanet - New build 8 pump PFS with timber kiosk building as part of new supermarket development in Thanet, Ramsgate.  Delivered November 2014.

Oakley - New build PFS in an existing supermarket site in Oakley, Cheltenham.  New PFS format creating a small 3 pump site designed to be used in existing or new sites where space for a full size PFS is not available.  Delivered October 2014.

Portishead - New build 4 pump pfs as part of a new Sainsbury's supermarket development in Portishead, North Somerset.  Delivered October 2014.

 
Sainsbury's
Completed Sites
Livingston PFS Whitehouse Farm PFS Small Format PFS
Sainsbury's
Small Format Remote Manned PFS
Martindales worked alongside Sainsburys to design and deliver their first small format PFS sites at Oakley, Whitehouse Farm and Livingston.  The company goal is to have a petrol offer at as many Sainsbury's stores as possible.
Hydrogen Installation, Hendon
Martindales worked alongside Air Products to deliver the new Hydrogen filling station located at Sainsbury's supermarket Hendon.

It is being delivered as part of a project aimed at creating the UK's first hydrogen transport system.  The London Hydrogen Network Expansion (LHNE) project, backed by UK government.  This is one of only a few in London and the first to be installed in conjunction with a traditional supermarket anywhere in the UK.

With the drive to make the fuel industry more green and a commercial roll out of hydrogen fuelled cars expected this year, this represents a massive step forward in progress of developing more ECO friendly vehicles and fuels.

Martindales are proud to have been a part of this fresh and innovative installation.


February 2015